Wednesday, September 6, 2017

DAY 8

We rarely get off work before sundown so we can only check out the state or renovations in the dark, now that the light fittings have been stripped. These few shots were illuminated with the iPhone but subsequently we brought a torch along. They've screeded the study area despite not having knocked down the wall yet which is a bit of a surprise to me but they're the experts so will leave it in their good hands.
View of the study from the balcony side.
A very dark scene with dark cement screed floor.
The vertical waste pipe is in the process of being boxed up with concrete blocks. This leaves very little space between the outlet for the WC and the boxed wall so that's a concern.
The location of sewage pipe and waste outlet for WC in the kitchen bathroom is reversed in position to the master bathroom.