| Not quite seamless since the frames had already been installed. |
![]() |
| The old sliding windows were removed. |
![]() |
| The study and living room windows. |
![]() |
| In with the new... |
![]() |
| Out with the old. |
![]() |
| Ready for disposal. |
![]() |
| A long horizontal window is used in the master bathroom. |
![]() |
| A little more context. |
![]() |
| Even the small windows were replaced. This one in the study room and another in Meg's room. |
![]() |
| The little one in Meg's room. |
![]() |
| Frameless opening in the master. |
![]() |
| The view outside this opening. |
![]() |
| It allowed lots of light to flood the apartment. |
![]() |
| A separate permit was required for the removal and installation of windows. This prompted my neighbour to ask me if we have two contractors! |
![]() |
| Detail 1. |
![]() |
| Electrical cables laid, ready to be concealed. |
![]() |
| One last look at this uninterrupted view before it's gone. |