Thursday, October 5, 2017

DAY 30

After a spurt of hard work, it's now tapered down. When we went this morning to check out the place, we noticed that little had been done. The plywood and covering of the front gate was done as promised so we were relieved about that but other than that, there were no other visible signs of work done. The WCs were placed in the two bathrooms so that we could try it out. They've not been cemented down yet. 
This is the space that'a presenting some problems with the washlet. The space is snug but there's not much we can do about that now. The left side will barely just fit the washlet and I suppose we can lean on the glass shower screen if we are feeling tired or lazy.
The false ceiling has been erected, covering the once exposed pipes.
The WC in the kitchen toilet is not much of a problem because there's more space to its left for the washlet. 