Monday, August 28, 2017

DAY 1

What lies behind the door?
We opened the door with trepidation, not knowing what to expect after the first day of hacking.
We popped by the apt at the end of the first day of renovations to see what was happening. I had come by earlier in the morning to drop the greeting cards under our neighbours' doors - the ones provided by the HDB to help new owners to break the ice with their neighbours - introducing ourselves and informing them of the impending renovations. We've not met any of them. Their doors are closed all the time, all three of them, and I had to slot the cards under their doors. HDB provided three cards so I gave one to our neighbours directly opposite us, to the right of us and below us. I wanted to give inform the neighbour diagonally across from us too but had no more cards to give so I left them out.
The HDB-provided cards which we dropped under the neighbours' doors. I thought the cards are a very good idea. It allows you to pen a message too! Well done HDB!
The flooring is supposed to be saved, so that we lay our tiles over it to save some costs. I guess that's why only certain portions were hacked. HDB only gives us three days to do the hacking, from 9am-5pm so all major noise producing works have to be finished within the three days, which isn't a lot of time if you have quite a few walls to hack!
The balcony wall tiles were stripped, as well as the floor. Balcony glass door was also removed.
The cooker hood and kitchen sink were dumped there.
Another view of the living room with kitchen entrance on the left.
The study.
The master bedroom. 
Another view from the master bedroom. On the left is the bathroom and on the right is the living.
The bathroom in the master.
The kitchen.
 A last look before leaving.

No comments: